
Ronggui, Guangdong — 2025
Exterior and interior flexible stone cladding across 2,800m², featuring Slate, Limestone, and Culture Brick panels for a premium natural stone aesthetic.

Baiyun District, Guangzhou — 2024
High-end lingerie boutique featuring Tooflexi lightweight MCM panels with curved wall installation, zero downtime and minimal structural requirements.

Guangdong Province — 2024
Modern gym interior with Rock Series accent walls, A2 class (GB 8624) MCM panels meeting strict safety codes while delivering authentic stone texture.

Nanshan District, Shenzhen — 2025
5-star hotel lobby feature wall spanning 420m² with book-matched travertine MCM panels, achieving a dramatic two-story visual while meeting A2 class (GB 8624) requirements — at 80% less weight than natural stone.

Pudong New District, Shanghai — 2025
Grade-A office tower exterior cladding across 15,000m² using Line Series MCM panels, delivering a sleek modern aesthetic with A2 class (GB 8624) compliance for high-rise safety — installed 60% faster than traditional stone.

Dongcheng District, Beijing — 2024
Cultural museum interior galleries and courtyard walls featuring Simulation Series Culture Brick, bridging contemporary museum architecture with traditional Chinese heritage — zero VOC for artifact-safe indoor air.

Xihu District, Hangzhou — 2024
Luxury villa community featuring Rock Series marble-look exterior cladding across 58 units, delivering premium curb appeal at a fraction of natural stone's structural load — each villa saved an estimated 12 tons of dead weight.

Jinjiang District, Chengdu — 2025
Premium shopping mall interior featuring High-End Series Calacatta-look MCM across common areas, escalator surrounds, and feature columns — luxury aesthetics with A2 class (GB 8624) commercial durability for high-traffic zones.

Haitang Bay, Sanya, Hainan — 2025
Beachfront resort exterior cladding and pool surrounds using Simulation Series Slate MCM, engineered for high-humidity tropical environments with salt-spray resistance and A2 class (GB 8624) compliance — zero corrosion after 12 months of oceanfront exposure.